June 2016 Space available, setting up Studio, my first task was to draw until there was no white left on the wall, while I was getting set up and had to do several trips to bring all the materials to the Studio. At first the old building didn't have electricity in the whole area so I purchased a lamp so i could work in the evenings . The building was a Swimming pool that had closed and was standing empty for a long time. Many repairs are required in the walls, roof, swimming